Control & integration - CSeries

Mandate:

As part of the production launch of the new CSeries aircraft, the Systemex Automation team was responsible for operations' control, integration and safety at the Bombardier plant in Ville Saint-Laurent. The scope of work consisted of the general risk analysis of operations, engineering, mechanical design, electrical installation, commissioning and operator training. Electrical installation work was carried out in collaboration with our partner DAWCO.

Features of the mandate:

  • Platforms measuring more than 365 inches in length by 116 inches in height
  • CSA Z32-04
  • 25 HMI and 5 PLC control panels
  • Remote inputs and outputs for each operation loop
Activities:

  • General risk analysis
  • Electrical engineering
  • Mechanical engineering
  • Pneumatic panels
  • PLC/HMI Programming
  • Installation
  • Performance tests
  • Commissioning
  • Training
Advantages:

  • Production improvement
  • Security of operations
  • Flexibility of the assembly line
  • Increased operational efficiency
  • Better control and management
  • Better schedule planning